802 | C6 Electronic flush valves · Installation Sentronic-S Installation, use and maintenance 3Installation Connection to the water supply and outlet. 1.) Push the tab on the side of the valve box to open the insertion hole for the power cable. (A5A9602C00 / A5A9602CM0) 2.) Connect the wa ter inlet and outlet so that they are aligned with the centre of the urinal. 3.) Place the valve box into the ditch and adjust the position with the aid of brackets. 4.) Connect the water inlet and outlet firmly. AC100-240V/home/webapps/asp_fr/data/asp/publications/roca-general/export-(export)/faucets-technical-manual-2016;50/60Hz >100mm Power cord extensibility >100mm Cable Block Attention: Central line of urinal • Should the valve box be incorrectly installed, this might affect the appearance of the product. •Make sure that the installation of the water inlet and outlet is correct. Otherwise the product might not function properly. •Before applying the cement and continuing with the installation, make sure there is no leak by conducting a water test. Install the mud protection box 1.) Apply a certain amount of release agent around the mud protection box. 2.) Attach the mud protection box to the valve box with screws and apply cement around them along with the tiles. Caution: • While cleaning the tiles, please do not use acid or alkaline detergent for cleaning in order to prevent the product from being damaged • For a proper installation of the front panel, make sure there is no excess cement on the sides of the front part. Build-in depth 7-30mm Valve box Mud protection box F ixin g b o lt x 4 Once the slurry is solid remove the mud protection box. Attentio n: Do not throw away the bolts as they will be used in the following stages of the installation.